Research Article
Intelligent Prediction of Transmission Line Project Cost Based on Least Squares Support Vector Machine Optimized by Particle Swarm Optimization
| Index | Formula | Unit |
| Unit length cost | Ontological cost /Single circuit length | 10kUSD/km | Unit length tower | Number of towers / Single circuit length | Base/km | Unit tower material consumption | Tower material consumption / Number of towers | t/Base | Unit length conductor consumption | Conductor material consumption / Single circuit length | t/km | Unit foundation steel consumption | Foundation steel consumption / Number of towers | t/Base | Unit foundation concrete consumption | Foundation concrete consumption / Number of towers | m3/Base | Unit earthwork consumption | Earthwork consumption / Number of towers | m3/Base |
|
|