Research Article

Intelligent Prediction of Transmission Line Project Cost Based on Least Squares Support Vector Machine Optimized by Particle Swarm Optimization

Table 2

Index unitization.

IndexFormulaUnit

Unit length costOntological cost /Single circuit length10kUSD/km
Unit length towerNumber of towers / Single circuit lengthBase/km
Unit tower material consumptionTower material consumption / Number of towerst/Base
Unit length conductor consumptionConductor material consumption / Single circuit lengtht/km
Unit foundation steel consumptionFoundation steel consumption / Number of towerst/Base
Unit foundation concrete consumptionFoundation concrete consumption / Number of towersm3/Base
Unit earthwork consumptionEarthwork consumption / Number of towersm3/Base