Research Article
Inexact Fuzzy Chance-Constrained Fractional Programming for Sustainable Management of Electric Power Systems
Table 3
Capacity expansion options and costs for power-generation facilities.
| | | Period | t=1 | t=2 | t=3 |
| Capacity-expansion options (GW) | Coal | m=1 | 0.05 | 0.05 | 0.05 | | m=2 | 0.10 | 0.10 | 0.10 | | m=3 | 0.15 | 0.15 | 0.15 | Natural gas | m=1 | 0.10 | 0.10 | 0.10 | | m=2 | 0.15 | 0.15 | 0.15 | | m=3 | 0.20 | 0.20 | 0.20 | Wind power | m=1 | 0.05 | 0.05 | 0.05 | | m=2 | 0.15 | 0.15 | 0.15 | | m=3 | 0.20 | 0.20 | 0.20 | Solar energy | m=1 | 0.05 | 0.05 | 0.05 | | m=2 | 0.15 | 0.15 | 0.15 | | m=3 | 0.20 | 0.20 | 0.20 | Hydropower | m=1 | 0.15 | 0.15 | 0.15 | | m=2 | 0.20 | 0.20 | 0.20 | | m=3 | 0.25 | 0.25 | 0.25 | Capacity expansion cost (106$/GW) | Coal | | | | | Natural gas | | | | | Wind power | | | | | Solar energy | | | | | Hydropower | | | | |
|
|