A Biobjective Optimization Model for Deadline Satisfaction in Line-of-Balance Scheduling with Work Interruptions Consideration
Table 3
Computational results for different parameter level combinations.
| | | Serial projects | Nonserial projects | ACT (seconds) | AUR | AD (%) | ACT (seconds) | AUR | AD (%) |
| | 0.1 | 5.23 | 0 | 0 | 1.14 | 0 | 0 | 0.3 | 1.47 | 0 | 0 | 0.66 | 0 | 0 | 0.5 | 0.98 | 0 | 0 | 0.46 | 0 | 0 |
| | 0.1 | 40.62 | 0 | 0 | 6.60 | 0 | 0 | 0.3 | 10.68 | 0 | 0 | 3.29 | 0 | 0 | 0.5 | 5.36 | 0 | 0 | 1.34 | 0 | 0 |
| | 0.1 | 105.23 | 1.6 | 0.42 | 47.69 | 1.4 | 0.53 | 0.3 | 24.85 | 1 | 0.15 | 11.82 | 0.2 | 0.21 | 0.5 | 17.88 | 0.6 | 0.07 | 2.61 | 0 | 0 |
|
|