Research Article

Planning of Electric Power Systems Considering Virtual Power Plants with Dispatchable Loads Included: An Inexact Two-Stage Stochastic Linear Programming Model

Table 1

The attributes for SVR prediction.

GDP
(102 million $)
Primary industry
(102 million $)
Secondary industry Tertiary industryIndustryElectricity consumption
(102GWh)

42.822.7923.8216.221.5067.24
78.193.3939.6935.1236.1170.97
88.173.6244.0640.4939.9375.14
98.813.8749.1245.8344.4984.30
118.444.1361.4452.8855.9593.90
142.924.8477.4560.6371.19105.29
179.435.1698.0976.1889.95115.45
205.034.75112.8887.40103.90130.10
241.325.06132.89103.37122.29148.41
308.685.63170.44132.62157.07154.77
345.575.92183.21156.44166.41165.05
423.796.69222.37194.73202.64193.72
519.487.34272.36239.78249.50208.55
592.377.88306.15278.34281.30222.96
663.498.66335.75319.09307.19238.34
722.529.18355.22358.12325.23247.18
759.799.59353.95396.26320.80255.34