Research Article

Planning of Electric Power Systems Considering Virtual Power Plants with Dispatchable Loads Included: An Inexact Two-Stage Stochastic Linear Programming Model

Table 2

Cost for power generation.

ā€‰Period 1Period 2Period 3

Cost for purchasing fossil fuels (103$/TJ)
Coal0.32,0.380.30,0.360.28,0.34
Natural gas0.35,0.420.33,0.400.31,0.38
Variable cost for power generation (103$/GWh)
Coal1.62, 1.871.54,1.781.46,1.69
Natural gas2.19,2.522.08,2.391.98,2.27
Solar4.90,5.104.66,4.844.42,4.60
Wind8.64,9.198.21,8.687.8,8.19
Hydro6.58,7.806.25,7.415.94,7.03