Research Article
Hierarchical Production Planning and Real-Time Control for Parallel Batch Machines in a Flow Shop with Incompatible Jobs
Table 2
Design of the simulation study.
| Factor | | Settings |
| 1 | Control strategy | PQT: PRS + QSM + TSM |
| | | QT: QSM + TSM |
| | | SF: SMWJ (80%W) + FCFS |
| | | SSF: SMWJ (80%W) + SMWT (1/3PT) + FCFS |
| 2 | Number of product types | 2, 4 and 6 |
| 3 | Release time distribution () | uniform |
| 4 | Due-date distribution () | + uniform (+) |
| 5 | Traffic intensity () | 0.6, 0.7, 0.8, 0.9, 1, 1.1 and 1.2 |
| 6 | Processing time | Operation in the most upstream of quenching: uniform(1,20) hours |
| | | Quenching (): uniform(10, 25) hours |
| | | Tempering (): uniform(5, 20) hours |
| 7 | Subcontracting parameters | Preparation time: 10 hours |
| | | Duration time: 1.2 (+) hours |
| | | Cost:10 /L for the duration time no more than 36 hours |
| | | 15 /L for the duration time more than 36 hours |
| 8 | Tardiness penalty cost rate | 10 uniform(1, 5) /hour |
| 9 | Energy cost rate | 100 /hour |
| 10 | Capacity of furnace | 500 L |
| 11 | Size of job | Uniform(20, 200) L |
| 12 | Number of furnaces (,) | (7, 5) |
|
|