Results of the different batch splitting strategies.
(a) |
| Results of Sample | Batch splitting strategy | Equal | Fixed | Fixed | Fixed | Not splitting |
| Number of lots | Max = 4 | 4 | 3 | 2 | - | Makespan of the best solution | 47.7 | 48.2 | 48.6 | 50 | 64 |
|
|
(b) |
| Results of Sample | Batch splitting strategy | Equal | Fixed | Fixed | Fixed | Fixed | Not splitting |
| Number of lots | Max = 5 | 5 | 4 | 3 | 2 | - | Makespan of the best solution | 143.1 | 165.2 | 153.9 | 143.3 | 142 | 164 |
|
|