Rolling Supply Chain Scheduling considering Suppliers, Production, and Delivery Lot-Size
Table 9
Frozen interval length test result.
| RHP | Total cost | PH | FI | Reschedule frequency | PI | DS | FS | ED | | | | | (PIP) | (PIP) | (PIP) |
| 30 | 10 | 10 | 337,200 | 374,200 (89.0%) | 351,200 (95.8%) | 357,200 (94.1%) | 30 | 15 | 15 | 337,200 | 342,200 (98.5%) | 340,560 (99.0%) | 351,200 (95.8%) | 30 | 20 | 20 | 337,200 | 342,200 (98.5%) | 343,200 (98.2%) | 354,200 (95.0%) |
| Average | | 352,866.7 | 344,986.7 | 354,200 |
|
|