A Hybrid Evolutionary Approach to Design Off-Grid Electrification Projects with Distributed Generation
Table 3
GA-PSO results for CM1 and CM2.
| ā | CM1 | CM2 |
| Users | 36 | 48 | Best Fitness | 9593 | 13089 | Total Power Loss [kW] | 1.83 | 3.53 | Total Cost [] | 95232 | 130050 | DG units | 4 | 5 | Installed Capacity [kW] | 60 | 85 | Bat. Bank [Ah] | 330 | 420 | Max per node [%] | 5.3 | 5.4 | Total Evolutions | 39 | 54 | Iteration Time [min] | 3 | 9 |
|
|