Research Article
A Hybrid Evolutionary Approach to Design Off-Grid Electrification Projects with Distributed Generation
Table 6
GA-PSO versus single objective/standard operators.
| | Single Objective | GA-PSO | Std. Operators |
| CM1 | | | |
| Ploss [kW] | 1.81 | 1.83 | 2.20 | Total Cost [] | 106693 | 95232 | 113651 | Installed Capacity [kW] | 70 | 60 | 65 |
| CM2 | | | |
| Ploss [kW] | 3.51 | 3.53 | 9.21 | Total Cost [] | 142656 | 130050 | 160483 | Installed Capacity [kW] | 95 | 85 | 85 |
|
|