Research Article

A High-Speed Train Operation Plan Inspection Simulation Model

Table 1

Section parameters (small-scale case).

SectionNumberMax number of trains containedOperation time (m:s)Minimum headway (m:s)
updownGDFirst G, second GFirst D, second GFirst G, second DFirst D, second D

Hengyangdong—Leiyangxi21611:1113:281:403:001:203:00
Leiyangxi—Chenzhouxi43815:5619:101:403:001:203:00
Chenzhouxi—Lechangdong65917:1520:471:403:001:203:00