Research Article
A High-Speed Train Operation Plan Inspection Simulation Model
Table 1
Section parameters (small-scale case).
| Section | Number | Max number of trains contained | Operation time (m:s) | Minimum headway (m:s) | up | down | G | D | First G, second G | First D, second G | First G, second D | First D, second D |
| Hengyangdong—Leiyangxi | 2 | 1 | 6 | 11:11 | 13:28 | 1:40 | 3:00 | 1:20 | 3:00 | Leiyangxi—Chenzhouxi | 4 | 3 | 8 | 15:56 | 19:10 | 1:40 | 3:00 | 1:20 | 3:00 | Chenzhouxi—Lechangdong | 6 | 5 | 9 | 17:15 | 20:47 | 1:40 | 3:00 | 1:20 | 3:00 |
|
|