A High-Speed Train Operation Plan Inspection Simulation Model
Table 6
Station parameters (large-scale case).
| Station | Number | Number of platforms | Arrival headway (m) | Departure headway (s) | Dwell time (s) |
| Wuhan | 1 | 20 | 2.5 | 1 | 180 | Wulongquandong | 2 | 4 | 2.5 | 1 | 60 | Xianningbei | 3 | 6 | 2.5 | 1 | 60 | Chibibei | 4 | 4 | 2.5 | 1 | 60 | Yueyangdong | 5 | 7 | 2.5 | 1 | 120 | Miluodong | 6 | 4 | 2.5 | 1 | 60 | Changshanan | 7 | 26 | 2.5 | 1 | 120 | Zhuzhouxi | 8 | 7 | 2.5 | 1 | 60 | Hengshanxi | 9 | 4 | 2.5 | 1 | 60 | Hengyangdong | 10 | 11 | 2.5 | 1 | 120 | Leiyangxi | 11 | 4 | 2.5 | 1 | 60 | Chenzhouxi | 12 | 6 | 2.5 | 1 | 60 | Lechangdong | 13 | 4 | 2.5 | 1 | 60 | Shaoguan | 14 | 6 | 2.5 | 1 | 40 | Yingdexi | 15 | 4 | 2.5 | 1 | 60 | Qingyuan | 16 | 4 | 2.5 | 1 | 60 | Guangzhoubei | 17 | 4 | 2.5 | 1 | 60 | Guangzhounan | 18 | 28 | 2.5 | 1 | 180 |
|
|