Accelerated Particle Swarm Optimization to Solve Large-Scale Network Plan Optimization of Resource-Leveling with a Fixed Duration
Table 1
Optimization parameter’s debugging results of the large-scale network plan optimization of resource-leveling with a fixed duration using the accelerated particle swarm algorithm (particle number is 50; = 100).
sequence number
1
1
2.05
2.05
1
23.97
2
1
2.05
2.05
0.33
19.31
3
1
2.05
2.05
0.31
18.97
4
1
2.05
2.05
0.3
17.58
5
1
2.05
2.05
0.29
18.61
6
1
2.05
2.05
3
31.43
7
1
2.05
2.05
0.1
31.39
8
1
2.05
2.05
0.03
31.43
9
1
3.5
0.4
1
22.99
10
1
3.5
0.4
0.03
31.43
11
1
3.5
0.4
0.5
21.4
12
1
3.5
0.4
0.8
31.43
13
1
3.5
0.4
0.3
23.02
14
1
3.5
0.4
0.6
16.35 error
15
1
3.5
0.4
0.4
20.8
16
1
3.5
0.4
0.35
19.9
17
1
3.5
0.4
0.33
18.4
18
1
3.5
0.4
0.31
25.5
19
0.8
2.05
2.05
1
24.53
20
0.8
2.05
2.05
0.3
31.43
21
0.8
2.05
2.05
1.2
31.43
22
0.8
2.05
2.05
0.4
31.43
23
0.8
2.05
2.05
0.5
31.00
24
0.8
2.05
2.05
0.6
25.85
25
0.8
2.05
2.05
0.7
18.93
26
0.8
2.05
2.05
0.8
22.38
27
0.729
1.454
1.454
1
17.83
28
0.729
1.454
1.454
0.8
25.00
29
0.729
1.454
1.454
1.05
20.54
30
0.729
1.454
1.454
0.9
18.33 error
Note. The value in italics is the optimal value under certain parameter conditions.