Accelerated Particle Swarm Optimization to Solve Large-Scale Network Plan Optimization of Resource-Leveling with a Fixed Duration
Table 3
The resource requirements of each unit time of large-scale network plan optimization of resource-levelling with a fixed duration using accelerated particle swarm algorithm (duration is 135).