Research Article

Stochastic C-GNet Environment Modeling and Path Planning Optimization in a Narrow and Long Space

Table 5

Minimum integrated cost value corresponding to each path.

Target−0.5, 0.8−0.4, 0.8−0.3, 0.8−0.2, 0.8−0.1, 0.80, 0.80.1, 0.80.2, 0.80.3, 0.80.4, 0.80.5, 0.8

Total cost1.81.71.51.41.21.071.11.521.521.621.6