Research Article
Optimization of Gantry Crane Scheduling in Container Sea-Rail Intermodal Transport Yard
Table 4
Gantry crane initial position list.
| Gantry crane number | Initial position |
| ā | Line 1 (Block 1) |
| | Line 1 (Block 2) |
| | Line 1 (Block 3) |
| | Line 2 (Block 8) |
| | Line 3 (Block 9) |
| | Line 3 (Block 10) |
| | Line 4 (Block 15) |
| | Line 4 (Block 16) |
|
|