Research Article

Long-Term Room and Pillar Mine Production Planning Based on Fuzzy 0-1 Linear Programing and Multicriteria Clustering Algorithm with Uncertainty

Figure 8

Results of the algorithm after: (a) 50 iterations. (b) 100 iterations. (c) 150 iterations. (d) 200 iterations.

(a)
(b)
(c)
(d)