Research Article
Long-Term Room and Pillar Mine Production Planning Based on Fuzzy 0-1 Linear Programing and Multicriteria Clustering Algorithm with Uncertainty
| Parameter | Value |
| Number of blocks | 115 |
| Block dimension | 25×25×5 m |
| Pillar dimension | 8×8×5 m |
| Planning time | 5 years; 60 months |
| Number of technological mining cuts | 5 |
| Metal content of concentrate | |
| Lead | 70% |
| Zinc | 50% |
| Metal recovery rate | |
| Lead | 95 % |
| Zinc | 42 % |
| Mill recovery rate | |
| Lead | 92 % |
| Zinc | 80 % |
| Capital costs ($) | |
| Capacity of production (t/year)-triangular fuzzy number | |
| Capacity constraint (t/year) | ± 10% |
| Fuzzy C-mean clustering-coefficient of fuzzification | 2 |
| Metal price linguistic variables M=7 | very very low (VVL), very low (VL), low (L), medium (M), high (H), very high (VH), very very high (VVH) |
| Discount rate-triangular fuzzy number (%) | |
|
|