Research Article
Long-Term Room and Pillar Mine Production Planning Based on Fuzzy 0-1 Linear Programing and Multicriteria Clustering Algorithm with Uncertainty
Table 5
Ore grade characteristics of TMC.
| TMC | Mean value of the grade (%) | Standard deviation of the grade (%) | Coefficient of the grade variation (%) | Lead | Zinc | Lead | Zinc | Lead | Zinc |
| 1 | 2.263 | 3.364 | 0.325 | 1.198 | 14.392 | 35.607 | 2 | 1.801 | 3.832 | 0.292 | 0.418 | 16.222 | 10.931 | 3 | 2.170 | 3.937 | 0.381 | 0.820 | 17.565 | 20.823 | 4 | 1.950 | 2.573 | 0.169 | 0.928 | 8.710 | 36.079 | 5 | 2.136 | 4.636 | 0.267 | 1.262 | 12.531 | 27.226 |
|
|