Research Article

Long-Term Room and Pillar Mine Production Planning Based on Fuzzy 0-1 Linear Programing and Multicriteria Clustering Algorithm with Uncertainty

Table 5

Ore grade characteristics of TMC.

TMCMean value of the grade (%)Standard deviation of the grade (%)Coefficient of the grade variation (%)
LeadZincLeadZincLeadZinc

12.2633.3640.3251.19814.39235.607
21.8013.8320.2920.41816.22210.931
32.1703.9370.3810.82017.56520.823
41.9502.5730.1690.9288.71036.079
52.1364.6360.2671.26212.53127.226