Research Article
Research on Construction Safety Risk Assessment of New Subway Station Close-Attached Undercrossing the Existing Operating Station
Table 10
Comprehensive correlation degree and risk grade of each second-level index.
| Correlation degree | | | | Risk grade |
| (A1 Station structure) | -0.061 | 0.021 | -0.010 | Medium risk | (A2 Track structure) | -0.130 | 0.130 | -0.088 | Medium risk | (A3 Power supply system) | -0.188 | -0.031 | 0.031 | Low risk | (A4 Water supply and drainage system) | -0.041 | -0.004 | 0.001 | Low risk | (A5 Ventilation and signal system) | -0.064 | -0.026 | 0.017 | Low risk | (B1 Construction monitoring of existing station) | -0.097 | 0.016 | -0.054 | Medium risk | (B2 New space enclosing structure) | -0.089 | -0.024 | 0.031 | Low risk | (B3 Engineering dewatering) | -0.022 | 0.024 | -0.021 | Medium risk | (B4 Foundation pit excavation) | -0.005 | 0.001 | -0.015 | Medium risk | (B5 Surrounding rock and soil mass and surrounding environment) | -0.020 | 0.003 | -0.025 | Medium risk | (B6 Construction technology management of main structure) | -0.136 | -0.033 | 0.034 | Low risk | (B7 Green construction) | -0.005 | 0.002 | -0.004 | Medium risk |
|
|