Comparison of the third-level index data of “existing subway station.”

Third-level index Risk assessment resultCorresponding risk grade of risk assessmentActual engineering measurement resultCorresponding risk grade of actual measurement Consistency

Absolute settlement value of station structure (mm)3.5Medium risk5.5Medium riskYes
Horizontal displacement of the station structure (mm)2.2Low risk2.9Low riskYes
Differential settlement of station structure deformation joint (mm)0.8Low risk0.7Low riskYes
Crack width of station structure (mm)0.16Medium risk0.1Medium riskYes
Orbital height difference (Vector value) (mm)1.8Low risk0.5Low riskYes
Transverse elevation difference of track (mm)1.9Low risk1.7Low riskYes
Void amount of track-bed (mm)4.2Medium risk3.0Medium riskYes
Area power outage renovation (h/times)0.3Low risk0.2Low riskYes
Circuit failure (times/month)0.6Low risk0.5Low riskYes
System blocking (h/times)0.9Low risk0.6Low riskYes
Pipeline damage (times/month)1.1Medium risk0.7Low riskNo
Equipment sampling pass rate (%)97Low risk96Low riskYes
Equipment failures (times/month)12Low risk10Low riskYes
Equipment renewal rate (%)2.6Low risk2.1Low riskYes
Equipment pending repair rate (%)5.7Medium risk3.6Low riskNo