Research Article

Research on Construction Safety Risk Assessment of New Subway Station Close-Attached Undercrossing the Existing Operating Station

Table 6

Judgment matrix of the first-level index “Existing subway station (A).”

A1A2A3A4A5

A1 Station structure11/31/232
A2 Track structure31254
A3 Power supply system21/2143
A4 Water supply and drainage system1/31/51/411/2
A5 Ventilation and signal system1/21/41/321