Research Article
Research on Construction Safety Risk Assessment of New Subway Station Close-Attached Undercrossing the Existing Operating Station
Table 6
Judgment matrix of the first-level index “Existing subway station (A).”
| | A1 | A2 | A3 | A4 | A5 |
| A1 Station structure | 1 | 1/3 | 1/2 | 3 | 2 | A2 Track structure | 3 | 1 | 2 | 5 | 4 | A3 Power supply system | 2 | 1/2 | 1 | 4 | 3 | A4 Water supply and drainage system | 1/3 | 1/5 | 1/4 | 1 | 1/2 | A5 Ventilation and signal system | 1/2 | 1/4 | 1/3 | 2 | 1 |
|
|