Research Article
A Two-Stage Stochastic Model for Maintenance and Rehabilitation Planning of Pavements
| Variable | Description | Domain |
| | First stage decision variable for M&R action m, section n and year t in the M&R work planning | |
| | Second stage decision variable for M&R action m, section n, year t and scenario s in the M&R work planning | |
| | Condition index | |
| | Auxiliary variable of condition | |
| | Binary variable determining whether or not (0) auxiliary variable of condition is in index b | |
| | Binary variable determining whether or not (0) the condition is in the poor zone in the VOC vs overall condition curve | |
| | Binary variable determining whether or not (0) the condition is in the good zone in the VOC vs overall condition curve | |
| | Auxiliary variable for the effect of poor condition on the VOC | |
| | Auxiliary variable for the effect of good condition on the VOC | |
| | Overall condition index | |
| | Intensity of distress variable | |
| | Auxiliary variable for intensity of distress | |
| | Condition drop | |
| | Auxiliary variable for condition drop | |
| | Condition drop at once M&R action was performed at t | |
|
|
can be replaced by f, t, s, or r which are, respectively, related to fatigue, thermal distress, skid, or roughness. |