Research Article
Analysis of the Effect of the Line-Seru Conversion on the Waiting Time with Batch Arrival
Figure 6
The average waiting queue length changed by the line-cell conversion, under different number of workstations in Scenario 2 (the reduced operations are fixed but downsizing is changed).