Table 1
Comparison for operation costs.
| Category | Two-stage robust planning | Static robust planning | Deterministic planning | Avg. | Max | Avg. | Max | Avg. | Max |
| Day-ahead operation cost /$ | 2359.9 | 2374.2 | 2264.1 |
| Adjustment cost /$ | Thermal units | 2.7 | 30.8 | 85.0 | 251.5 | 375.9 | 1153.7 | Hydro units | 123.2 | 169.4 | 153.9 | 221.8 | 51.1 | 145.3 | Wind power curtailment | 0 | 0 | 73.0 | 500.9 | 314.9 | 1053.1 | PV power curtailment | 0 | 0 | 53.1 | 473.2 | 225.2 | 813.9 |
| Total cost /$ | 2485.8 | 2541.4 | 2739.2 | 3348.3 | 3231.2 | 4098.5 |
|
|