Research Article

The Integration of Wind-Solar-Hydropower Generation in Enabling Economic Robust Dispatch

Table 4

Adjustment cost under different adjustable prediction error.

Categoryα=0α=0.25α=0.5α=0.75α=1
Avg.MaxAvg.MaxAvg.MaxAvg.MaxAvg.Max

Adjustment cost of thermal units /$00000.610.62.628.12.730.8

Adjustment cost of hydro units /$0031.342.361.283.691.2122.4123.2169.4

Wind power curtailment cost /$0000000000

PV power curtailment cost /$0000000000

total adjustment cost /$0031.342.361.983.693.8148.0125.9181.5