Optimization Analysis of the Position of Thermometers Buried in Concrete Pouring Block Embedded with Cooling Pipes

Figure 8

Meshing of intermediate sections for four different water-pipe spacing cases.

(a) Pipe spacing 1.0 m × 1.0 m
(b) Pipe spacing 1.5 m × 1.5 m
(c) Pipe spacing 1.0 m × 1.5 m
(d) Pipe spacing 2.0 m × 1.5 m

We are committed to sharing findings related to COVID-19 as quickly and safely as possible. Any author submitting a COVID-19 paper should notify us at help@hindawi.com to ensure their research is fast-tracked and made available on a preprint server as soon as possible. We will be providing unlimited waivers of publication charges for accepted articles related to COVID-19. Sign up here as a reviewer to help fast-track new submissions.