Parameters for the investment cost of the hydropower station.

IndexParameter
(yuan/kw) (yuan/kw) (107yuan/kw) (yuan/kw) (yuan/kw)

187.456996.22(2.15, 2.41, 2.68)0.013610.2
205.826996.22(2.15, 2.41, 2.68)0.013610.2

378.3914270.05(2.15, 2.41, 2.68)0.013610.2
415.8514270.05(2.15, 2.41, 2.68)0.013610.2

378.4114270.71(7.87, 8.27, 8.67)0.013610.2
415.8714270.71(7.87, 8.27, 8.67)0.013610.2

266.310000(3.22, 3.31, 3.40)0.013610.2
292.5710000(3.22, 3.31, 3.40)0.013610.2

266.310000(3.22, 3.31, 3.40)0.013610.2
292.5710000(3.22, 3.31, 3.40)0.013610.2