A Line Planning Approach for High-Speed Rail Networks with Time-Dependent Demand and Capacity Constraints

Table 5

The number of trains (train)/average load factor/average time deviation (min) on HSR corridors.

Corridor

OL362/68.64%/39.45352/70.52%/39.73348/73.17%/41.77389/73.10%/-
Beijing-Shanghai116 /77.17% /14.17108/77.62%/14.64104/79.14%/17.05106/76.66%/-
Beijing-Shenzhen232 /66.47% /19.66194/72.78%/21.12164/75.31%/24.70269/50.98%/-
Beijing-Ha’erbin-Dalian302 /64.08% /18.84290/66.99%/19.71250/74.34%/22.82360/60.25%/-
Shanghai-Hangzhou-Shenzhen320/73.24%/17.59306/75.38%/18.16304/78.64%/20.02222/83.93%/-
Nanjing-Hangzhou12/76.95%/13.3114/76.68%/13.7312/77.15%/13.8613/39.33%/-
Wuhan-Nanchang-Fuzhou34/54.31%/70.7332/52.72%/63.7328/62.91%/73.027/57.67%/-
Shanghai-Kunming (partial)22/64.61%/61.0320/69.79%/68.8528/66.75%/81.9711/64.15%/-
Hengyang-Liuzhou42/64.53%/41.5140/66.15%/42.3740/70.98%/41.3933/74.51%/-
Shanghai-Nanjing-Chengdu284/70.03%/22.07276/71.45%/21.25270/77.84%/24.29237/73.10%/-
Zhengzhou-Xi’an40/62.96%/36.9536/63.71%/35.5036/68.37%/43.8928/44.01%/-
Jinan-Qingdao46/78.27%/27.9046/78.76%/26.1146/79.59%/28.1044/77.02%/-
Hefei-Bengbu8/59.77%/29.766/69.69%/29.978/71.08%/29.726/81.48%/-
Shijiazhuang-Taiyuan-Xi’an16/53.10%/25.7214/52.34%/25.3114/56.45%/28.4721/75.03%/-