Intelligent Prediction of the Construction Cost of Substation Projects Using Support Vector Machine Optimized by Particle Swarm Optimization
Table 1
Sixteen key influencing factors.
| Index type | Key influencing factors | Serial number |
| Technical parameter level | Transformer capacity | | Number of circuit breaker | | Number of exit route | | Number of reactors | | Number of capacitor | | Control cable length | | Power cable length | | Concrete consumption | | Steel consumption | |
| Cost parameter level | Price of transformer | | Price of circuit breaker | | Price of concrete | | Price of steel | |
| External environment | Site acquisition cost | | Site area | | Planning cost | |
|
|