Research Article
Analysis on Guide Vane Closure Schemes of High-Head Pumped Storage Unit during Pump Outage Condition
Figure 9
Simulation results of transition process on three-stage delayed GVCS of Head 4. (a) RSRR. (b) Guide vane opening. (c) Volute pressure. (d) Draft tube pressure.
(a) |
(b) |
(c) |
(d) |