Research Article

Analysis on Guide Vane Closure Schemes of High-Head Pumped Storage Unit during Pump Outage Condition

Table 4

Index data of minimum WHP and RSRR under the three-stage delayed GVCS of Head 4.

Max. volute pressureMax. draft tube pressureMax. speed riseUpstream surge tankDownstream surge tank
Max.Min.Max.Min.

Min. WHR690.80121.71−0.81740.20722.65179.08153.11
Min. RSRR761.40123.89−0.01740.05722.26178.74153.33