Inversion Modeling of Dam-Zoning Elasticity Modulus for Heightened Concrete Dam Using ICS-IPSO Algorithm

Table 4

A comparison of the measured displacements and identified displacements obtained by the inversion analysis of typical measuring points at different water levels (mm).

Displacements

Date2017/9/212017/10/112017/10/19
Water level161.76164.56166.34161.76164.56166.34

PL1-10.0690.1270.1700.0700.1270.167
PL1-20.1530.2840.3760.1570.2860.377
PL2-10.2690.4870.6330.2650.4830.636
PL2-20.6251.1161.4570.6211.1171.458
PL2-30.7591.3551.7660.7591.3591.770

Note: in this case, the reservoir water level of 157.79 m on August 24, 2017, was used as the initial water level .