Research Article

Inversion Modeling of Dam-Zoning Elasticity Modulus for Heightened Concrete Dam Using ICS-IPSO Algorithm

Table 5

A comparison of the measured displacements and calculated displacements of typical measuring points at different water levels (mm).

Displacements

Date2017/10/252017/11/262017/12/27
Water level166.74166.01165.52166.74166.01165.52

PL1-10.1730.1570.1450.1770.1600.148
PL1-20.4030.3590.3360.3990.3600.334
PL2-10.6770.6100.5660.6720.6070.564
PL2-21.5381.3881.3001.5371.3931.298
PL2-31.8611.6871.5781.8651.6921.578

Note: in this case, the reservoir water level of 157.79 m on August 24, 2017, was used as the initial water level .