A Hybrid Approach for Project Crashing Optimization Strategy with Risk Consideration: A Case Study for an EPC Project
Table 4
Project duration in case of different expected times.
| Activity | Average time (days) | Optimistic time (days) | Pessimistic Time (days) | Most likely time (days) | Start time | Project duration | Start time | Project duration | Start time | Project duration | Start time | Project duration |
| 0 | 0 | 1005 | 0 | 857 | 0 | 1122 | 0 | 1032 | A | 119 | 107 | 131 | 119 | B | 232 | 202 | 258 | 236 | C | 318 | 275 | 355 | 325 | D | 389 | 334 | 434 | 398 | E | 459 | 393 | 512 | 470 | G | 549 | 472 | 610 | 562 | H | 619 | 531 | 688 | 634 | I | 1005 | 857 | 1122 | 1032 |
|
|