Linguistic terms and the evaluation scale for “expected costs.”
| Cost | Code | Grey value | System repair costs |
| Close to original price | (O) | [9, 10] | Cost is similar to the original | Enormously important | (EI) | [8, 10] | Cost is enormously important’ | Very important | (VI) | [7, 9] | Cost is very important’ | Important | (I) | [6, 8] | Cost is important’ | Moderately important | (MI) | [5, 7] | Cost is moderately important’ | Moderate | (M) | [4, 6] | Cost is moderate’ | Moderately low | (ML) | [3, 5] | Cost is quite low’ | Soft | (S) | [2, 4] | Cost is acceptable’ | Distant | (D) | [1, 3] | Cost is affordable’ | Approximately no cost | (N) | [1, 2] | Almost no cost is required’ |
|
|