Research Article
Uncertainty Evaluation of Water Inrush in Karst Tunnels Based on Epistemic Uncertainty with Possibility Theory
Figure 10
Uncertainty connected with normalized margins defined in equation (33) characterized by possibility summarized with CPoF and CNF: (a) for , (b) for , (c) for , and (d) for .
(a) |
(b) |
(c) |
(d) |