Research Article

Uncertainty Evaluation of Water Inrush in Karst Tunnels Based on Epistemic Uncertainty with Possibility Theory

Figure 10

Uncertainty connected with normalized margins defined in equation (33) characterized by possibility summarized with CPoF and CNF: (a) for , (b) for , (c) for , and (d) for .
(a)
(b)
(c)
(d)