Research Article

Mathematical Model of Air Pocket Evolution during Water Filling a Long-Slope Pipeline and Its Application to Air Removal Prediction

Table 1

Mileage and elevation data of test pipelines.

PipelineLocationLength (km)Elevation (m)

Pipeline 1Initial station0751
Peak point116.611345.4
Valley point (valve chamber 1)208.91432.7
Peak point (valve chamber 2)295.8798
Terminal station535.6705

Pipeline 2Initial station01921.2
Peak point31.82589.03
Valve chamber 391.412049.58
Valley point145.451560.54
Valve chamber 4290.722276.7
Peak point402.842827.81
Terminal station438.452198.8