Research Article
Research on Mathematical Model of Cost Budget in the Early Stage of Assembly Construction Project Based on Improved Neural Network Algorithm
Table 1
Component production cost.
| No. | Name of cost | Content of cost |
| 1 | Labor cost of component production | Higher salaries shall be paid to professional workers | 2 | Material cost of component production | Basically the same materials as required by the traditional construction method | 3 | Mold cost of component production | Cost of table molding, binding steel bar mold, concrete pouring mold, maintenance mold, and finished component mold | 4 | Amortization expense | Amortization fee based on specific types of components and specific quantities of molds | 5 | Cost of setting the embedded parts and pipelines | Costs incurred in arranging the embedded parts and pipelines in the installation components, mainly the pipeline costs | 6 | Management and storage cost | Additional management and storage costs after maintenance of component productions | 7 | Water and electricity charges | Electricity and water charges incurred by factory component production |
|
|