Variation of Rock Mass Pressure during Tunnel Construction in Phyllite Stratum

Table 2

Monitoring results of rock mass pressure in YK214 + 011 section/MPa.

Monitoring positionsBefore upper bench excavationBefore lower bench excavationBefore the construction of invertBefore the construction of the secondary liningFinal monitoring value
Rock mass pressureRatio (%)Rock mass pressureRatio (%)Rock mass pressureRatio (%)Rock mass pressureRatio (%)

Y00.034170.080390.174840.196950.206
Y10.063540.066570.060520.100860.116
Y2
Y30.013250.015290.019370.0521000.052
Y40.00330.033370.078880.0891000.089
Y50.037400.012130.064690.093
Y60.046210.170760.2231000.223
Y70.0651550.042
Y8