Research Article
Variation of Rock Mass Pressure during Tunnel Construction in Phyllite Stratum
Table 8
Range of parameters for rock mass pressure and excavation time.
| Function types | Basic form | Parameters | Value range |
| Logarithmic function | | | −52.439∼0.017 | | −5.248∼−0.084 | | −24∼119.254 |
| Logistic function | | | 0.014∼0.026 | | 0.021∼0.233 | | 456.969∼638.652 | | 5.339∼11.030 |
| Multiple functions | | | −0.006∼0.086 | | −0.0004∼0.0004 | | −0.00001∼0.00002 | | −0.00002∼0.00005 |
|
|