Research Article
Research on Two-Stage Joint Optimization Problem of Green Manufacturing and Maintenance for Semiconductor Wafer
Table 13
Pareto optimal solution set obtained by IHMMVO algorithm (part).
| ā | (kgCO2) | (RMB) | (min) | Scheduling scheme |
| 1 | 2.9 (3.7) | 1022 (0) | 366 (421) | 1-3-8-9-10-6-5-4-2-7 | 2 | 2.9 (3.4) | 985 (0) | 349 (412) | 4-3-6-10-5-8-7-1-2-9 | 3 | 3.1 (3.5) | 847 (0) | 355 (404) | 4-9-3-5-8-6-7-10-2-1 | 4 | 3.2 (3.6) | 813 (0) | 361 (413) | 8-4-3-1-9-7-6-10-5-2 | 5 | 3.0 (3.5) | 936 (0) | 359 (410) | 9-3-4-10-2-8-7-1-5-6 | 6 | 3.1 (3.4) | 1152 (0) | 342 (379) | 10-6-4-7-5-3-8-1-2-9 | 7 | 3.0 (3.2) | 884 (0) | 364 (389) | 1-4-3-5-6-2-9-7-8-10 | 8 | 3.0 (3.5) | 852 (0) | 349 (411) | 1-2-3-4-7-5-6-10-8-9 | 9 | 3.0 (3.5) | 920 (0) | 353 (430) | 1-2-3-6-5-4-8-7-9-10 | 10 | 2.9 (3.3) | 1025 (0) | 348 (401) | 1-3-7-4-5-6-2-8-10-9 |
|
|