Research on Two-Stage Joint Optimization Problem of Green Manufacturing and Maintenance for Semiconductor Wafer

Table 13

Pareto optimal solution set obtained by IHMMVO algorithm (part).

ā€‰ (kgCO2) (RMB) (min)Scheduling scheme

12.9 (3.7)1022 (0)366 (421)1-3-8-9-10-6-5-4-2-7
22.9 (3.4)985 (0)349 (412)4-3-6-10-5-8-7-1-2-9
33.1 (3.5)847 (0)355 (404)4-9-3-5-8-6-7-10-2-1
43.2 (3.6)813 (0)361 (413)8-4-3-1-9-7-6-10-5-2
53.0 (3.5)936 (0)359 (410)9-3-4-10-2-8-7-1-5-6
63.1 (3.4)1152 (0)342 (379)10-6-4-7-5-3-8-1-2-9
73.0 (3.2)884 (0)364 (389)1-4-3-5-6-2-9-7-8-10
83.0 (3.5)852 (0)349 (411)1-2-3-4-7-5-6-10-8-9
93.0 (3.5)920 (0)353 (430)1-2-3-6-5-4-8-7-9-10
102.9 (3.3)1025 (0)348 (401)1-3-7-4-5-6-2-8-10-9