Research Article
Research on Two-Stage Joint Optimization Problem of Green Manufacturing and Maintenance for Semiconductor Wafer
Table 4
Typical literature about PM research.
| Literature | Approaches | Objectives |
| Liu et al. [31] | Genetic algorithm | Minimize the production costs and tardiness costs | Huang and Yu [32] | Cluster particle swarm algorithm | Minimize makespan | Ladj et al. [33] | Improved genetic algorithm | Minimize the total interventions costs | Xiao et al. [34] | Stochastic key genetic algorithm | Minimize the total costs | Golpîra and Tirkolaee [35] | CPLEX | Minimize the total costs of the maintenance and maximize the stability/robustness of the schedule | Goli et al. [36] | CPLEX | Minimize the total-weighted time and the total costs of outsourcing |
|
|