Research Article
Modeling and Simulation of Collaborative Dispatching of Disaster Relief Materials Based on Urgency
Table 8
Pareto optimal allocation scheme with integrated minimization of transportation cost and penalty cost.
| Plan | Number of vehicles | Mianyang | Deyang | Guangyuan | Chengdu | Cost | Beichuan | Mao county | An county | Pingwu | Jiangyou | Mianzhu | Shifang | Qingchuan | Wenchuan | Dujiangyan | Pengzhou | Li County | Penalty cost | Transportation cost |
| 1 | 100 | 9 | 0 | 22 | 0 | 0 | 0 | 52 | 0 | 17 | 0 | 0 | 0 | 1.27e + 06 | 9.13e + 07 | 2 | 200 | 35 | 0 | 49 | 0 | 0 | 0 | 42 | 0 | 47 | 0 | 21 | 6 | 9.76e + 05 | 2.49e + 08 | 3 | 300 | 35 | 30 | 49 | 0 | 35 | 0 | 57 | 0 | 51 | 16 | 21 | 6 | 8.30e + 05 | 4.01e + 08 | 4 | 400 | 35 | 0 | 49 | 0 | 35 | 0 | 98 | 0 | 110 | 16 | 21 | 6 | 4.07e + 05 | 5.80e + 08 | 5 | 500 | 35 | 30 | 49 | 0 | 35 | 38 | 116 | 56 | 98 | 16 | 21 | 6 | 3.33e + 05 | 7.72e + 08 | 6 | 600 | 35 | 30 | 49 | 0 | 35 | 111 | 116 | 56 | 125 | 16 | 21 | 6 | 4.78e + 04 | 8.94e + 08 | 7 | 700 | 35 | 30 | 49 | 116 | 35 | 95 | 116 | 56 | 125 | 16 | 21 | 6 | 2.32e + 04 | 1.25e + 09 |
|
|