Research Article

Study on Grey Correlation Degree Decision-Making Model for Investment Scheme on High-Grade Highways in Western China

Table 7

Comparison table of the technical and economic indexes of all alternative plans.

No.ItemUnitPlan APlan BPlan CPlan D

1Highway classArterial highwayArterial highwayArterial highwayArterial highway
2Design lifeYear15202015
3Route lengthkm1.2751.11.1321.018
4Number of lanespcsTwo-way 4 lanesTwo-way 6 lanesTwo-way 6 lanesTwo-way 4 lanes
5Number of horizontal curvespcs4335
6Minimum radius of horizontal curvem/pcs350/1400/1350/2380/2
7Maximum longitudinal grade%/pcs1.2/11.0/11.1/11.1/1
8EarthworkFillm387,66274,76389,10090,140
Excavationm318,67611,83320,06422,774
9Masonry of protection engineeringm31,5891,5491,4551,546
10Treatment of special subgradem597482.3610633.5
11Subgrade widthm24.5292932
12PavementAsphalt concretem228,27027,50028,020
Cement concretem229,300
13Peak acceleration of Earthg0.20.20.20.2
14Bridgem/building1111
15At-grade intersectionpcs3265
16Culvert and channelpcs6666
17Demolished buildingsm236,27028,40044,45149,127
18Occupied landmu948689.491.3
19Construction costsRMB 10,0006,544.85,365.816,975.17,013.9