| No. | Item | Unit | Plan A | Plan B | Plan C | Plan D |
| 1 | Highway class | — | Arterial highway | Arterial highway | Arterial highway | Arterial highway | 2 | Design life | Year | 15 | 20 | 20 | 15 | 3 | Route length | km | 1.275 | 1.1 | 1.132 | 1.018 | 4 | Number of lanes | pcs | Two-way 4 lanes | Two-way 6 lanes | Two-way 6 lanes | Two-way 4 lanes | 5 | Number of horizontal curves | pcs | 4 | 3 | 3 | 5 | 6 | Minimum radius of horizontal curve | m/pcs | 350/1 | 400/1 | 350/2 | 380/2 | 7 | Maximum longitudinal grade | %/pcs | 1.2/1 | 1.0/1 | 1.1/1 | 1.1/1 | 8 | Earthwork | Fill | m3 | 87,662 | 74,763 | 89,100 | 90,140 | | Excavation | m3 | 18,676 | 11,833 | 20,064 | 22,774 | 9 | Masonry of protection engineering | m3 | 1,589 | 1,549 | 1,455 | 1,546 | 10 | Treatment of special subgrade | m | 597 | 482.3 | 610 | 633.5 | 11 | Subgrade width | m | 24.5 | 29 | 29 | 32 | 12 | Pavement | Asphalt concrete | m2 | 28,270 | 27,500 | 28,020 | — | Cement concrete | m2 | — | — | — | 29,300 | 13 | Peak acceleration of Earth | g | 0.2 | 0.2 | 0.2 | 0.2 | 14 | Bridge | m/building | 1 | 1 | 1 | 1 | 15 | At-grade intersection | pcs | 3 | 2 | 6 | 5 | 16 | Culvert and channel | pcs | 6 | 6 | 6 | 6 | 17 | Demolished buildings | m2 | 36,270 | 28,400 | 44,451 | 49,127 | 18 | Occupied land | mu | 94 | 86 | 89.4 | 91.3 | 19 | Construction costs | RMB 10,000 | 6,544.8 | 5,365.81 | 6,975.1 | 7,013.9 |
|
|