Research Article

Construction of Risk Evaluation Index System for Power Grid Engineering Cost by Applying WBS-RBS and Membership Degree Methods

Table 5

Cost risk indicator score.

Index codeThe number of specialistsThe membership degree (Zt)

R111710.651376
R112710.651376
R121830.761468
R122290.266055
R123940.862385
R124720.660550
R131370.339450
R211570.523936
R212670.614679
R213630.642202
R214900.825688
R221370.339450
R222380.348624
R311750.688073
R312920.844037
R321810.743119
R322490.449541
R411640.770642
R412700.642202
R421690.633028
R422490.449541
R511500.458716
R512660.651376
R521250.229358
R522180.623853
R523960.880734
R5311060.972477
R532740.678899