Research Article

Generation-Load Coordinative Scheduling considering the Demand-Response Uncertainty of Inverter Air Conditioners

Table 1

Temperature and wildlife count in the three areas covered by the study.

IndexParameters of generation-cost functionMaximum power (kW)

10.00150.03301000
20.00210.0260550
30.00380.0445450