Research Article
The Analysis on Seepage Field of Grouted and Shotcrete Lined Underwater Tunnel
Table 4
Contrast table of tunnel water inflow (m3/d).
| ā | Working condition 1 | Working condition 2 | Working condition 3 | Working condition 4 |
| Test | 2.76 | 4.68 | 5.40 | 9.22 | This paper | 2.37 | 4.05 | 5.50 | 8.60 | Errors | 16% | 16% | ā2% | 7% |
|
|