Research Article
Accuracy Evaluation of Advanced Geological Prediction Based on Improved AHP and GPR
Table 3
Grading and value of evaluation factors.
| Factor | Actual value | Standard value | Relative value | More accurate | Accurate | Relatively accurate | Inaccurate |
| Frequency selection | 100 MHz | 100 MHz | 1 | 85–115 0.85 ≤ F1 | 75–85 115–125 0.7 ≤ F1 < 0.85 | 65–75 125–135 0.65 ≤ F1 < 0.75 | <65 >135 0.4 ≤ F1 < 0.65 | Time window selection | 500 ns | 500 ns | 1 | 450–500 0.9 ≤ F2 | 400–450 550–600 0.8 ≤ F2 < 0.9 | 350–400 600–650 0.7 ≤ F2 < 0.8 | <350 >650 0.6 ≤ F2 < 0.7 | Antenna spacing selection | 1.5 m | 1.8 m | 0.6 | 1.8–2.1 2.1–2.2 0.95 ≤ F3 | 1.4–1.8 2.2–2.6 0.85 ≤ F3 < 0.95 | 1.0–1.4 2.6–3.0 0.75 ≤ F3 < 0.85 | <1.0 >3.0 0.65 ≤ F3 < 0.75 | Measuring point distance | 0.08 m | 0.1 m | 0.8 | 0.095–0.105 0.9 ≤ F4 | 0.085–0.095 0.105–0.115 0.7 ≤ F4 < 0.9 | 0.075–0.085 0.115–0.125 0.5 ≤ F4 < 0.7 | <0.075 >0.125 0.4 ≤ F4 < 0.5 | Line layout | 50% | 60% | 0.68 | >51% 0.85 ≤ F5 | 45%–51% 0.75 ≤ F5 < 0.85 | 39%–45% 0.65 ≤ F5 < 0.75 | <39% 0.55 ≤ F5 < 0.65 | Site interference | 87% | 100% | 0.9 | 95% 0.95 ≤ F6 | 90%–95% 0.9 ≤ F6 < 0.95 | 85%–90% 0.85 ≤ F6 < 0.90 | <85% 0.75 ≤ F6 < 0.85 | Tunnel face information | 0.8 | 1 | 08 | 0.95–1 10.95 ≤ F7 | 0.85–0.95 0.85 ≤ F7 < 0.95 | 0.75–0.85 0.75 ≤ F7 < 0.85 | <0.75 0.65 ≤ F7 < 0.75 | Overall tunnel information | 0.6 | 1 | 0.5 | 0.75–1 0.75 ≤ F8 | 0.5–0.75 0.5 ≤ F8 < 0.75 | 0.25–0.5 0.25 ≤ F8 < 0.55 | 0–0.25 0 ≤ F8 < 0.25 | Software processing | 0.8 | 1 | 0.9 | 0.9–1 0.9 ≤ F9 | 0.8–0.9 0.8 ≤ F9 < 0.9 | 0.7–0.8 0.7 ≤ F9 < 0.8 | <0.7 0.6 ≤ F9 < 0.7 | Interpretation of image data | 0.8 | 1 | 0.8 | 0.8–1 0.8 ≤ F10 | 0.6–0.8 0.6 ≤ F10 < 0.8 | 0.4–0.6 0.4 ≤ F10 < 0.6 | <0.4 0.2 ≤ F10 < 0.4 | Prediction of distance | 30 m | — | — | 0–15 m | 15–30 m | 30–40 m | >40 m |
|
|