Research Article

A Genetic Algorithm for a Two-Machine Flowshop with a Limited Waiting Time Constraint and Sequence-Dependent Setup Times

Table 5

Effect of due date parameters on the performance of CPLEX.

0.50.8Average

0.21435.141580.842313.121776.37
0.42172.742473.35880.951842.35
0.6905.23255.19759.17639.86
Average1504.371436.461317.751419.53