Journals
Publish with us
Publishing partnerships
About us
Blog
Mathematical Problems in Engineering
Journal overview
For authors
For reviewers
For editors
Table of Contents
Special Issues
Mathematical Problems in Engineering
/
2020
/
Article
/
Tab 5
/
Research Article
A Genetic Algorithm for a Two-Machine Flowshop with a Limited Waiting Time Constraint and Sequence-Dependent Setup Times
Table 5
Effect of due date parameters on the performance of CPLEX.
0.5
0.8
Average
0.2
1435.14
1580.84
2313.12
1776.37
0.4
2172.74
2473.35
880.95
1842.35
0.6
905.23
255.19
759.17
639.86
Average
1504.37
1436.46
1317.75
1419.53